Professional installation - why this is not a DIY job
You will find dozens of "how to lay balcony flooring yourself" tutorials on internet forums. And yes - technically it is possible. But the difference between a DIY floor and a professional installation is like the difference between a selfie and a studio portrait.
The challenge is not in laying the boards themselves. What really matters is: precise measurement, correct joist spacing, cutting to the exact balcony shape, and proper water drainage. A single error during measurement and the entire floor will not fit.
Step 1: LiDAR scanner measurement
Everything begins with measurement. Forget about the traditional tape measure - at BalkonSetup we use a LiDAR scanner that creates a three-dimensional model of your balcony with millimetre accuracy.
Why does this matter?
- No balcony is perfect - walls are rarely parallel, angles are rarely exactly 90 degrees
- Thresholds, drains, pipes - the scanner captures every obstacle
- L-shapes, corners - precise measurement of 6 sides, not just 2
The measurement is free of charge and takes just a few minutes. A specialist comes to your location, scans the balcony, and then you configure the floor together in our app - choosing the panel pattern, layout, and seeing a visualisation of the final result.
Step 2: Configuration and quote
Based on the 3D scan, our simulator automatically calculates:
- The number and placement of joists (optimal spacing)
- The number of panels including trimming
- The quantity of mounting clips
- The amount of butyl tape (joist insulation)
- The exact cost of materials and installation
You receive the quote with a visualisation and contract by email the very same day. There are no hidden costs - the quoted price is the final price.
Important: We do not add any markup to the panel price. You buy them at the same price as if you ordered directly from the manufacturer. You only pay for the installation service.
Step 3: Material ordering and CNC processing
After the deposit is paid, we start production:
- We order the panels in your chosen pattern from the manufacturer
- CNC cutting - a digital router cuts every panel with millimetre precision, exactly to your balcony dimensions
- We prepare the joists - cut from 3-metre raw stock
- We assemble the clips - the right quantity matched to the project
CNC processing is our competitive advantage. A traditional installer cuts on-site with a saw - generating noise, dust, and inaccuracies. We cut everything in the workshop, and on the balcony we simply assemble pre-cut components.
Step 4: Subfloor preparation
Before installation, we inspect the balcony screed:
- Slope - the screed should have a slight slope toward the balcony edge (for water drainage)
- Cleanliness - we remove debris, dust, and remnants of any previous finish
- Integrity - cracks, defects - we flag any issues before covering them with flooring
Step 5: Joist installation
Joists are the skeleton of the entire structure. We lay them:
- Perpendicular to the panels - ensuring proper support
- At the correct spacing - typically 30 cm, adjusted according to the load
- With edge clearance - 5 to 10 mm from walls and railings, depending on the arrangement with the client (to compensate for thermal expansion)
- On butyl tape - insulating the joist from the screed, eliminating vibrations and noise
The joists are not permanently fixed to the screed - the system is "floating", which protects the balcony waterproofing and allows for future removal.
Step 6: Panel installation with clips
We mount the panels using a clip system - mounting clips connect the panels to the joists, creating even expansion gaps between the boards.
The gaps between panels are not a flaw - they are a designed feature. They allow for:
- Water drainage
- Subfloor ventilation
- Thermal expansion compensation
Step 7: Finishing and handover
Finally:
- We check the stability of the entire structure
- We verify the evenness of gaps
- We clean up any debris and tidy the balcony
- We hand over the finished floor with care instructions
How long does it take?
The entire process from measurement to finished floor takes a minimum of 10 working days. The on-site installation itself typically takes about 1 hour - because all components arrive pre-cut and ready to assemble.
| Stage | Duration |
|---|---|
| Measurement + configuration | 30 - 45 minutes |
| Quote (email) | Same day |
| Ordering + CNC processing | 7 - 10 working days |
| On-site installation | approx. 1 hour |
You choose the installation date yourself via our online calendar - access is granted immediately after paying the deposit.
Quote within minutes, no obligations.